360 Tour

Infrastructure: Already In Place

Network Drive has been developed to support the headquarters operations of technologically demanding, cutting-edge companies, as evidenced in existing buildings and provision for new, build to suit facilities.

The power behind the park includes:

  • Redundant electrical service provided by 2 x 15kv primary NStar electrical services to an on-campus 15kv switchgear
  • Oversized, built-in generators for electrical back-up
  • Redundant communications cabling for quality digital networking and telephone
  • MT 24 and MT 72 cable for T1s, T3s and fiber muxes
  • FiOS available
  • Closed-loop chilled water system generated from the campus Central Utility Plant (CUP)
  • Free cooling during winter months through a plate & frame heat exchanger located in the CUP
  • Up-to-date safety and security systems